PROVISION OF NEW HANGAR AT AF STATION CARNICOBAR Last date March 21, 2019
CONSTRUCTION OF EMERGENCY LANDING FACILITY FROM KM 246.200 TO KM 249.700 (DESIGN LENGTH 3.5 KM) ON SRINAGAR-BANIHAL SECTION OF NH 1A (NEW NH-44) IN THE STATE OF JAMMU AND Kashmir - April 1, 2019
EXTENSION OF RUNWAY 20 BEGINNING AND STRENGTHENING OF APRON, CONSTRUCTION OF NEW TAXI-TRACK AND STRENGTHENING OF RUNWAY AND LINK TAXIWAY (20 END) INCLUDING PARALLEL ...March 22, 2019
CONSTRUCTION OF PEB HANGAR WITH LEANS AND INFRASTRUCURE INCLUDING PROVISION OF NEW DISPERSAL WITH TWO TAXI TRACK AT INS BAAZ CAMPBELL BAY March 23, 2019
EXTENSION OF RUNWAY 20 BEGINNING AND STRENGTHENING OF APRON, CONSTRUCTION OF NEW TAXI-TRACK AND STRENGTHENING OF RUNWAY AND LINK TAXIWAY (20 END) INCLUDING PARALLEL TAXIWAY AND ISOLATION BAY AND VEHICULAR LANE AT LGBI AIRPORT, GUWAHATI
CONSTRUCTION OF ELEVATED CORRIDOR FLY OVER FROM DAMOH NAKA TO RANITAL MADAN MAHAL IN CITY JABALPUR I/C SHIFTING OF H.T.L.T ELECTRIC LINE AND TRANSFORMER WITH PROVIDING NEW AS PROPOSED BY MPKVVCL JABALPUR
CONSTRUCTION OF EMERGENCY LANDING FACILITY FROM KM 246.200 TO KM 249.700 (DESIGN LENGTH 3.5 KM) ON SRINAGAR-BANIHAL SECTION OF NH 1A (NEW NH-44) IN THE STATE OF JAMMU AND Kashmir - April 1, 2019
EXTENSION OF RUNWAY 20 BEGINNING AND STRENGTHENING OF APRON, CONSTRUCTION OF NEW TAXI-TRACK AND STRENGTHENING OF RUNWAY AND LINK TAXIWAY (20 END) INCLUDING PARALLEL ...March 22, 2019
CONSTRUCTION OF PEB HANGAR WITH LEANS AND INFRASTRUCURE INCLUDING PROVISION OF NEW DISPERSAL WITH TWO TAXI TRACK AT INS BAAZ CAMPBELL BAY March 23, 2019
EXTENSION OF RUNWAY 20 BEGINNING AND STRENGTHENING OF APRON, CONSTRUCTION OF NEW TAXI-TRACK AND STRENGTHENING OF RUNWAY AND LINK TAXIWAY (20 END) INCLUDING PARALLEL TAXIWAY AND ISOLATION BAY AND VEHICULAR LANE AT LGBI AIRPORT, GUWAHATI
CONSTRUCTION OF ELEVATED CORRIDOR FLY OVER FROM DAMOH NAKA TO RANITAL MADAN MAHAL IN CITY JABALPUR I/C SHIFTING OF H.T.L.T ELECTRIC LINE AND TRANSFORMER WITH PROVIDING NEW AS PROPOSED BY MPKVVCL JABALPUR
No comments:
Post a Comment